• 841 Xinmin Avenue, Tongan District, Xiamen City, Fujian Province, China

  • 13779976298

  • elly@packingleadermachinery.com

products

Underpad Production

Underpad Production

Details

护理垫新.png 护理垫2.jpg

Performances 


1. Volume (million pieces/ year) 

20-70 million pieces

2. Designed Speed 

250m/min 

3. Stable Speed 

210-240m/min

4.  Passing rate 

≥ 98% (Not include the glue applicator, Auto Splicing)

Technical Parameter 


1. Power Supply 

3 phase, 5 wires  (380v, 50HZ)

2. Power Installed 

250KW include Glue filter

3. Power Used 

220KW

4. Electric wire

3×120mm2+1×50mm2+1×25mm2

5. Compressed Air Supply

0.6~0.8Mpa

6. Compressed Air Absorption 

4000 Nl/min

7. Machine Size

28.0m× 7.0m× 3.5m(L× W× H )

8. Working Size 

39m× 9.0 ´5.0m  (L× W× H )

9. Machine Weight 

about 40t (whole production line)

10. Machine Color

Confirm with Customer

11. Machine Direction

From Right to Left (can be designed as customer’s demand)

12. Containers

4´ 40 HQ containers